Doncaster PaintersResidential House Painting (period & exterior repaints) · Doncaster, VICGet in touch

Painting a House Before You Move In: A Doncaster Buyer's Guide

Why the gap between settlement and move-in matters

Buying a family home in Doncaster, Templestowe or Donvale usually comes with a list of things you would change on day one: tired cream walls, dark timber trims, the bedroom a teenager painted purple, a scuffed and patched hallway. The easiest time to deal with most of it is in the days or weeks between settlement and the removalist truck arriving. An empty house is faster, cleaner and simpler to paint than one full of furniture, and you only have to live through the disruption once.

The catch is that this window is usually short and fixed, so the work has to be planned before settlement rather than after it. This guide covers how to use that window well, what to prioritise if you cannot do everything, and what is better left until you have lived in the house for a while.

Planning before you get the keys

You generally will not have access to the property until settlement, apart from the pre-settlement inspection, and any earlier access is at the vendor's discretion. That means most of the planning happens from the listing photos, the floor plan and one or two visits.

If you can, use the pre-settlement inspection, or a second visit arranged through the agent, to walk the house with your painter. A quote written from a proper walk-through is far more reliable than one based on photos, because the things that change the scope, such as cracked cornices, water-stained ceilings, smoke-stained walls, gloss enamel on walls or a previous owner's rough patching, rarely show clearly in listing photos.

Book the painter's start for settlement day or the day after, and leave a buffer before the removalists. Settlement dates do occasionally move, so ask how a changed date would be handled before you lock anything in.

What to paint first when time is short

If the window will not stretch to the whole house, prioritise the work that is hardest to do once you have moved in.

Ceilings

Ceilings are the most disruptive surface to paint in a lived-in home, because every room has to be cleared or the furniture pushed to the middle and covered. In an empty house they are straightforward. If the ceilings are yellowed, water-stained or patchy, do them now.

Bedrooms and living areas

Bedrooms come next, particularly children's rooms, because you want them finished and aired before anyone sleeps in them. Main living and family rooms follow, since that is where the heaviest furniture ends up and where repainting later means the most shuffling.

Doors, skirtings and trims

Trims are slow, careful work, but they are much easier to reach with no beds, wardrobes or couches against the walls. If you are changing the trim colour, or moving from old oil-based enamel to a water-based enamel, it makes sense to do it in the same visit as the walls.

The exterior can usually wait

Exterior painting depends on the weather and does not need an empty house. On a large two-storey Manningham home it is also a bigger project that is better scoped on its own. Unless there is a pressing problem, such as peeling weatherboards or rotting fascia boards, the outside can usually wait until you have lived through a season in the house and know what you want. Our exterior house painting and weatherboard, eaves and fascia repaints services can be booked separately when you are ready.

Things to check in an older Manningham home

Many homes in Doncaster, Bulleen and Doncaster East were built in the 1960s and 1970s. Paint applied before 1970 may contain lead, and sanding or scraping it creates toxic dust, which matters most if you are moving in with young children or are pregnant. If the house is from that era, ask your painter to test suspect surfaces before preparation starts and to explain how any lead-containing paint will be managed. It is far easier to deal with in an empty house than around a family.

Homes of that age also tend to have stained timber panelling, raked ceilings, painted-over wallpaper and walls finished in gloss enamel. Each needs its own preparation, and they are the items most likely to blow out a quote written without a walk-through.

Look for signs of moisture as well: stains on ceilings below bathrooms, bubbling paint low on walls, or mould in wet areas. Paint will not fix a leak, so have the cause repaired first and paint afterwards.

Choosing colours for a house you do not know yet

It is tempting to pick a full scheme from the listing photos, but colours behave differently with your own furniture, floors and light. A practical approach is to choose one white or soft neutral for the ceilings and most walls throughout, which gives a clean and consistent base, and to hold off on feature colours until you have lived in the rooms for a few months.

If you are allowed to during a visit, hold large painted sample boards against the walls in each main room and look at them at different times of day. The north-facing living areas common on Doncaster's hillside blocks can make a colour look very different from the same colour in a south-facing bedroom.

Moving in after the painters

Modern low-odour water-based paints are generally dry to the touch within hours, but they take longer to cure fully and stay softer and easier to mark in the meantime. Ask your painter how long to allow before furniture goes hard against the walls, and keep rooms ventilated for the first few days. Let the removalists know the paint is fresh so they take care with corners and door frames.

Keep a note of the brand, colour name and sheen used in each room. A few touch-ups after the move are almost inevitable, and having the exact details saves guesswork later.

Getting a quote

If you have bought in Doncaster, Templestowe, Donvale or Bulleen and want the inside painted before you move in, get in touch with your settlement date. We can arrange a walk-through, give you a written quote for our interior house painting service, and schedule the work around your settlement and removalist dates.

Get a Free Quote

Ready to Get Started?

Contact us today for your free, no-obligation quote.

Request a Quote
Get in touch